Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>Oil - Fired Steam Boiler | 3D CAD Model Library | GrabC
Oil - Fired Steam Boiler | 3D CAD Model Library | GrabCAD
My first model, an oil fired steam boiler, still lacking some components such as level gauge, pumps, control box, etc. August 5th, 2016. My first model, an oil fired steam boiler, still lacking some components such as level gauge, pumps, control box, etc. Show more
Get A Quote
>6th Gas Fired Hot Water Boiler For Fodd
6th Gas Fired Hot Water Boiler For Fodder
electric water boilers manufacturers - nordsee-suite. bbalkrishn boilers,steam boiler,boiler,water boiler,boiler manufacturer,fully wetback three pass packaged boiler,water wall membrane pannel f.b.c. fired boiler,oil and gas fired fully wet back boiler,rice husk and saw dust fired fully wetback boiler,nutshell and coconut shell fired fully wetback boiler,petcock and imported coal fired fully
Get A Quote