Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>200Kg Hr Diesel Fired Boiler - coprorestudio.c
200Kg Hr Diesel Fired Boiler - coprorestudio.com
200Kg Hr Diesel Fired Boiler. Gas Fired Vacuum Hot Water Condensing Boiler. Hot Water Boiler; Gas Fired Vacuum Hot Water Condensing Boiler Fuel consumption, diesel Kg/h, 5.3, 7.59, 10.6, 15.9, 21.2, 95.4, 107.8, 127.3, 159.1, 190.9 Klargester Environmental Maintenance and repair of Unvented Hot Water Storage & Boilers - Harton Heating
Get A Quote
>100kg diesel fired industrial steam boil
100kg diesel fired industrial steam boiler
Practice 1 100kg diesel fired industrial steam boiler, a monthly gauge of the trap should be washed once, check the pressure gauge is working normally and accurate. 2, coping backup water supply equipment (such as steam Chu, the water injector) once a week commissioning, ensure its good operating order. 3, each class should check the induced draft fan, grate and other bearing grease, the
Get A Quote