Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>20tph coal fired steam boiler - ferienwohnung-ruegen-putbus.
20tph coal fired steam boiler - ferienwohnung-ruegen-putbus.de
China Steam Boiler manufacturer, Pressure Vessel, 2017-4-17 · Steam Boiler, Pressure Vessel, Coal Fired Boiler, Biomass Fired Boiler, Wood Fired Boiler, Gas or Oil Fired Boiler, Bagasse Fired Boiler, Industrial Boiler, CFB Boiler Company Introduction ShanDong Tai'an Shan Kou Boiler group Co., Ltd(abbreviation: Shan Kou Boiler Group)was founded in 1976, has 40 years of history.
Get A Quote