Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>3ton steam boiler package boiler – supply hot water boil
3ton steam boiler package boiler – supply hot water boiler
Aug 14, 2018· Fire tube boiler – ZBG Fire tube boiler with steam and hot water(1-20 ton) are widely used in paper mill, textile plant, Installation, Package boiler, complete in all respects and little site work involved, Generally built 3 ton gas fired fire tube boiler for seafood plant Steam Boilers- स्टीम बॉयलर, Manufacturers, Suppliers Stainless Steel Industrial Steam Boiler, Capacity (kg/hr): 500-2000 Kg/hr. …
Get A Quote