Introduction
SZL series vertical dual drums chain grate water tube steam and hot water boiler, adopts quick fitting and assembly structure. The 4-6t/h boiler is of quick fitting tube structure, exit shop after completely assembled, the boiler of 6-35t/h is composed of 2 main components. The upper assembled component is the boiler proper heat absorbing part, and the lower assembled component is of combustion equipment. The former part of the boiler proper is arranged a membrane wall, the upper part of it is connected to boiler cylinder, and its lower part is connected to collective chest, so as to form a combustion room and absorb the radiated heat from the furnace. Its rear part is arranged with dense convection tubes between upper and lower boiler cylinders. The high temperature smog after combustion shall stand for twice returning flushing transversely to the heat accepting surfaces, and shall be introduced to coal saver singly arranged, and flow into duster and exhausted from chimney in the end.
Technical advantages
>Boilers Tenders – Tenders for Boilers Tenders in Ind
Boilers Tenders – Tenders for Boilers Tenders in India
procurement of gland packing at ntpc jhanor , 10 mm sq gland pckg - boiler control v/v , pack glnd is:4687 gr . -3 asb met 8 , 6 mm sq gland pckg - boiler control v/v , non asb packing ring ( inconel rein ) 12 mm , gland packing m , g 14 mm rope , 16mm gland pkg rope is:4687 gr-3 , 8 mm sq gland packing - style 36 , 10 mm sq gland packing - style 36 , 12 mm sq gland packing - style 36 , rope
Get A Quote